Secure Fitting Of Your Memorial

 

1-foundation-sited

Our precast reinforced concrete foundation is dug in and set to ground level.

2-foundation-with-tube

Stainless steel ground anchor tube is inserted into the foundation and hammered down.

3-foundation-tube-fully-inserted

The tube is now full inserted and flush with the foundation.

4-peg-into-base

Here you can see the peg ready to insert into the memorial base.

5-peg-offering-up

The anchor peg shown inserted into the memorial base, wooden skids down
ready for the memorial to be offered up.

6-peg-into-tube

This shows the peg from the memorial base now inserted into the anchor tube.

7-adhesive-applied

Stone bond adhesive has now been applied to either side of the memorial
and a spacer inserted to allow removal if required at a later date. Skids are now removed and memorial is lowered into the adhesive.

8-completed-memorial

Memorial now completed and fitted to NAMM & BRAMM standards

9-finished-memorial

Side view of completed memorial